RAMS AND METHOD STATEMENTS

RAMS: risk assessment and method statement packs for each job and site

Opus RAMS, an add-on to Compliance Cloud, is where your team produces site-specific RAMS for each job, and an Opus consultant can build your first template pack with you. After that, a similar job starts from the pack you already have. No regulation names RAMS. In Great Britain the duty behind them is the risk assessment under regulation 3 of the Management of Health and Safety at Work Regulations 1999, and on construction work regulation 15 of the Construction (Design and Management) Regulations 2015 requires every contractor to plan, manage and monitor its own work.

Man Looking Into a macbook
Busy professional multitasking in an office environment
What We Deliver

What the RAMS service includes

The risk assessment decides what a job has to control, and the method statement sets out how the work will be done with those controls in place. Opus gives your team the software to produce both, and a consultant to set it up with you or to write the RAMS for a single job.

Cube Icon

Opus RAMS, for the RAMS your team produces

Opus RAMS is an add-on to Compliance Cloud for producing site-specific RAMS packs. Each pack draws on standard Opus risk assessments and method statements, or your own, adapted to the project. It adds the training certificates of the people named and the certificates for the plant from your Compliance Cloud records, and exports the pack as one PDF to issue to the client or principal contractor.

Suitcase Icon

Your first template pack, built with a consultant

An Opus consultant builds your first template pack with you in Opus RAMS: the risk assessments, method statements and site information for a type of job your teams repeat, written around how you do it. After that, a similar job starts from the template, and your team changes what is different about the new site.

Monitor Icon

RAMS written for a single job

If you need RAMS for one job, your consultant can write the risk assessment and method statement for it: the steps in order, the controls at each step, who does the work and who supervises it, the equipment, and what happens in an emergency. For work your teams repeat, we recommend the template pack, because each new job then starts from documents you already have.

What you get

What lands on your desk afterwards

RAMS your supervisor can brief from and your client can check, in the same format for every job.

A template pack for the work you repeat

The risk assessments, method statements, emergency procedures and site induction for that type of job, adapted from standard Opus documents or your own, ready to copy for the next project.

A method statement in the order the work happens

HSE describes a method statement as setting out "in a logical sequence exactly how a job is to be carried out in a way that secures health and safety and includes all the control measures". Each job's copy is adjusted for its own site.

The people and the plant

The training certificates for the people named and the inspection certificates for the plant, taken from your Compliance Cloud records, so the pack carries the latest version of each.

One PDF to issue

The pack exports as a single PDF for your client or principal contractor, with the site induction register and sign-off sheets for the briefing.

HOW WE DELIVER

From first call to delivered

Three steps. Clear ownership. No surprises.

01
DISCOVERY

Tell us what you need

We listen first. The work your teams repeat, the sites, and who asks you for RAMS. Then we recommend the right service, not the biggest one.

02
DELIVERY

An expert does the work

Your consultant builds your template pack with you in Opus RAMS, starting from the risk assessments and site information you already have. Practical, not theoretical. Everything done properly the first time.

03
OUTCOME

Clear deliverable you can act on

A template pack your team copies for each new job and issues as one PDF. Plus 30 days of email support so you can move on it with confidence.

Evidence

What you should be able to show

These are what the law and HSE's guidance point to if a principal contractor, a client's auditor or an inspector asks how a job is controlled. Could you put your hands on all six today?

  • ✓A risk assessment covering the work, with the significant findings recorded if you employ five or more people
  • ✓A method statement for higher-risk, complex or unusual work, written for the site where it happens
  • ✓For demolition or dismantling, the arrangements recorded in writing before the work begins
  • ✓The names of the people doing the work, with the skills, knowledge, training and experience their tasks need
  • ✓A record that each worker received the information, instructions and supervision the job needs
  • ✓Thorough examination records for the cranes, slings and other lifting equipment the job uses
Speak with an expert
Business owner working through compliance records at a desk
What it costs

What RAMS cost

Price depends on a number of variables, including:

Whether you already use Compliance Cloud

Opus RAMS is an add-on to Compliance Cloud, so the starting point is whether your business has an account.

How many types of job the template pack covers

A pack for one kind of job is a smaller piece of work than a set covering every activity your teams carry out.

How much the site changes the job

Routine work repeated across similar sites mostly needs adapting. Work beside other trades, a live process or members of the public needs more planning.

What already exists

A method statement draws on the risk assessment, so current assessments for your activities shorten the work.

For what a good method statement contains, and how to check one a contractor sends you, read our guide to RAMS. On a construction project, method statements help the principal contractor develop the construction phase plan, which our CDM consultancy draws up for the principal contractor, or for the contractor whose duty it is.

Choose how to start

Two ways to work with Opus

Book a one-off service for a specific need, or take on a partnership for ongoing support. Either way, the work gets done by the same team.

One-off service

Book a service

For a specific need - a single assessment, audit, or
on-site service with a clear deliverable.

Checkmark Icon
Delivered by experienced H&S consultants
Checkmark Icon
Sector-specific assessments, not templates
Checkmark Icon
Clear report with prioritised actions
Checkmark Icon
30 days of email support after delivery
Request a quote
Ongoing partnership

Opus Safety Partnership

Ongoing support and consider-it-done compliance. For businesses that want compliance off their plate, not on their to-do list.

Checkmark Icon
Named consultant who knows your sites
Checkmark Icon
Site visits set in your contract (typically two to four a year) and ongoing compliance delivery
Checkmark Icon
Compliance Cloud for real-time visibility
Checkmark Icon
Training coordination and regulatory updates
Checkmark Icon
Unlimited phone and email support
Explore the Partnership

Not sure which fits? Speak to a consultant - no commitment required.

Kellaway

Abbie Tovey, Personnel & Welfare Manager
Multi-site Builders Merchant
5 Stars Icon
"Our consultant is always on hand with friendly, helpful, knowledgeable and commercial advice. They really take the time to get to know the people, business and values, so that they really add value in their contributions."
Business professional talking on a phone outdoors on a street
Why Opus

Why businesses bring RAMS to Opus

HSE's guidance is that a method statement allows "the job to be properly planned with the appropriate health and safety resources needed for it", and that checking the methods "are actually put into practice on site can also be a useful monitoring tool". So your RAMS are written from how the job will run on the day, ready to be checked against the work.

Former health and safety inspectors on the team

Our consultants include former health and safety inspectors, so your RAMS are written to answer the questions an inspector may ask about the job.

Consultants who know contracting work

Tom Bradley was managing director of a contracting company for 12 years before moving into safety full time, and has particular experience in CDM and contractor management. David Clifton lists temporary works, lifting operations, work at height and confined spaces among his specialisms.

One consultant, one record

On the Opus Safety Partnership, method statements sit with the risk assessments your consultant already writes, and Compliance Cloud holds the training records the RAMS refer to.

Industries

RAMS by sector

Arrow Down Icon
Builders Merchants
Box Vector

Builders Merchants

A yard alteration or new racking going in while the branch trades puts contractors near forklifts and customers. The method statement sets out how the work area is kept apart from yard traffic and the trade counter.

Forklift operator working in a builders merchant warehouse
Arrow Down Icon
Warehousing & Logistics
house Vector

Warehousing & Logistics

Repairing damaged pallet racking puts a contractor working at height into an aisle the trucks use. Offloading and cordoning the bay come first in the method, and trucks stay out of the aisle until the repair is done.

Smiling warehouse workers in blue shirts organizing and handling boxes on shelves in a distribution center.
Arrow Down Icon
Manufacturing & Engineering
Box Vector

Manufacturing & Engineering

Installing fixed plant, or maintaining a machine with the production line running beside it, needs isolation and access planned before the first step. Your RAMS name who isolates the machine and who signs it back into use.

Two factory workers in blue jackets assembling or inspecting items on a production conveyor in a brightly lit industrial workshop.
Arrow Down Icon
Garden Centres
Box Vector

Garden Centres

A refit or a new building while the centre stays open puts the public beside the work. Fencing off the work area, and timing deliveries and lifts, are part of the plan.

Garden centre staff member assisting a customer
Arrow Down Icon
Metal Stockholders
Box Vector

Metal Stockholders

Overhead cranes and long, heavy stock put lifting at the centre of maintenance work. Regulation 8 of the Lifting Operations and Lifting Equipment Regulations 1998 requires every lifting operation involving lifting equipment to be properly planned by a competent person, and the RAMS record that plan.

Large warehouse storing stacks of steel tubes, metal safety barriers, and various metal components organized in sections.
Arrow Down Icon
Childcare & Nurseries
Box Vector

Childcare & Nurseries

Building or maintenance work during opening hours brings contractors into a building full of young children. The work area is closed off, and noisy or dusty work is timed for when the rooms nearby are empty.

Request a quote

Ready to book your first RAMS template pack?

Tell us about the work your teams repeat and who asks you for RAMS. We'll call you back, usually within 2 hours on working days, to talk it through and quote. You get a template pack in Opus RAMS that your team adapts for each new job and site.

Prefer to book a call directly?

Smiling woman with long black hair wearing a sleeveless black top, standing indoors with a plant and window in the background.
Thanks - we've got it. We usually reply within 2 hours on working days. If it's more urgent, call us on 0330 043 4015.
Oops! Something went wrong while submitting the form.

Frequently asked questions

What does a RAMS service include?

Down Arrow Icon

Can we use a method statement template instead?

Down Arrow Icon

If a consultant helps with our RAMS, who is responsible for them?

Down Arrow Icon

A client has asked for RAMS before we start. What should we send?

Down Arrow Icon

Do we need RAMS for maintenance work outside construction?

Down Arrow Icon

Do RAMS need to be signed by the people doing the work?

Down Arrow Icon

Can one set of RAMS cover several sites?

Down Arrow Icon

How much do RAMS cost?

Down Arrow Icon

Still have questions?