Opus RAMS: Your shortcut to site-specific Risk Assessment Method Statements

John Southall
February 16, 2026
2
min read
Risk Assessment Method Statements (RAMS) reduce the risks of potentially dangerous work, proving you’ve considered safety at every step of the job – from assessing hazards to identifying control measures and outlining clear, step-by-step protocols.
While RAMS are core due diligence tools for companies and contractors, they’re also time-consuming, repetitive, and error-prone – packed with recycled copy-and-paste content that does nothing to address site-specific hazards.
From March 2026, Opus RAMS will remove that friction.
Create tailor-made RAMS in minutes
Opus RAMS is a swift, structured way to create complete, site-specific RAMS packs in minutes rather than hours.
Opus RAMS brings together all required safety information in a single, well-formatted, accessible PDF that’s ready to issue to clients, principal contractors, or inspectors. Documents include:
- Risk assessments
- Method statements
- COSHH
- Manual handling
- Plant certificates
- Staff training records
- Inductions
- Sign-off sheets
Instead of relying on static templates, Opus RAMS pulls live data – covering people, training, assets, and documentation – making every pack consistent, current, and 100% audit-ready.
Streamlined, speedy, and cost-effective
Outpacing pricier alternatives, Opus RAMS fills the gap for regulators and principal contractors who need detailed, site-specific documentation – and for clients who want speed without compromising quality. It delivers measurable benefits for:
- Contractors and subcontractors undertaking site or maintenance work.
- Construction, maintenance, and engineering firms.
- Facilities management teams.
- Health & safety consultants producing RAMS for clients.
- Businesses requiring structured RAMS packs as part of pre-qualification or bid processes.
- Site managers and supervisors.
See how Opus RAMS can work for you
At Opus, we’re committed to creating practical tools that solve real, day-to-day safety problems.
To discover how Opus RAMS can reduce manual effort and make safety faster and easier for your business, book a sneak preview before the March launch.
Schedule a free demo on 0330 043 4015 or hello@opus-safety.co.uk.

John Southall
February 16, 2026
2
min read


.png)
.png)
